Workshop No. 9 has been put into operation.

10July
2024
Workshop No. 9 has been put into operation.

In June, the company completed the equipping and commissioning of Workshop No. 9, located on the territory of the M7 Industrial Park.

In the new 1,500 sq.m. area, products for the assembly of double-girder overrunning cranes are manufactured, such as control cabins, cargo trolleys, and more. The workshop area is divided into sections for welding posts and includes a paint booth and a range of machine tools for performing the full cycle of work. The most bulky parts of the cranes, the bridges, are manufactured in neighboring workshops.